Ritz Carlton Hotel at Lake
Las Vegas
|
|
![]() |
![]() |
|
View of Ritz Carlton looking Northwest. |
View
of Ritz Carlton Bridge looking East.
|
|
Project
consists of an eight level main hotel building, six level parking garage,
a four level bridge, three level casino,and a two level |
Bridge
is founded on CISS (Cast in Steel Shell) three foot diameter Pipe Piles.
Bridge spans a total of 360 feet with approximately 100 feet between pier/abutment
supports.
|
![]() |
|
| Ritz Carlton Hotel and Bridge looking west. | |
| Ritz Carlton Hotel shown at approximately 75% structurally complete. The Hotel is anticipated to be finished with construction in the Fall of 2002. | |